All sites

DICT Regional Office — Tuguegarao

Client approved
Tuguegarao City, CagayanDepartment of ICT
Site profile
Device ID
KIT-AX-001023
Technician
J. Santos
Install date
2026-04-12
Contact
Ms. Reyes (IT Lead)

Primary connectivity for regional office.

SLA targets
Download100 / ≥ 100 Mbps
Upload20 / ≥ 20 Mbps
Latency60 / ≤ 60 ms
Uptime99.5 / ≥ 99.5%
Pkt loss0 / ≤ 1%
Installation evidence
Installer uploads photos in 4 steps. Data Lake QA reviews each one before UAT.
0 ok

Photograph the proposed antenna mounting point with clear sky-view, the AP locations inside the building, and the cable path. Include a wide shot of the room/roof.

  1. Step 0Site survey
  2. Step 1Installation proper
  3. Step 2Network testing & validation
  4. Step 3Video walkthrough
  5. DocsDocuments
Step 0Site surveyRequired

Proposed antenna and access-point locations

0 items
Sample reference for Site survey

Sample guidance · Photograph the proposed antenna mounting point with clear sky-view, the AP locations inside the building, and the cable path. Include a wide shot of the room/roof.

Wide rooftop shot with proposed mount point and clear sky-view.

No site survey uploaded

Pick "Site survey" in the upload form above to add evidence for this step.

Step 1Installation properRequired

Mounted hardware, cabling, grounding, power

0 items
Sample reference for Installation proper

Sample guidance · Show the installed antenna, the mounting hardware, cable routing through the wall, grounding, and the power source / UPS. One photo per element is fine.

Mounted antenna with neat cable routing and grounding visible.

No installation proper uploaded

Pick "Installation proper" in the upload form above to add evidence for this step.

Step 2Network testing & validationRequired

Speed test screenshots, signal stats

0 items
Sample reference for Network testing & validation

Sample guidance · Upload speed-test results (download/upload/latency), the Starlink app stats screen, and any packet-loss or uptime evidence. These should match the SLA fields recorded on this site.

Speed test result showing download, upload, and latency.

No network testing & validation uploaded

Pick "Network testing & validation" in the upload form above to add evidence for this step.

Step 3Video walkthroughRequired

Short video of the working installation

0 items
Sample reference for Video walkthrough

Sample guidance · A 30–60 s walkthrough showing the antenna, the AP, and a working device. If the file is too large, upload a poster frame here and paste the Google Drive link in the notes.

Short walkthrough video of the live AP and a connected device.

No video walkthrough uploaded

Pick "Video walkthrough" in the upload form above to add evidence for this step.

DocsDocuments

Endorsement letter, signed endorsement, NMS report

0 items
Sample reference for Documents

Sample guidance · Attach the signed endorsement letter, any acceptance forms, and the NMS report. The documentation team reviews these after QA clears the photo evidence.

Signed endorsement letter and acceptance forms.

No documents uploaded

Pick "Documents" in the upload form above to add evidence for this step.

Documentation review
Documentation team verifies paperwork after QA approves photo evidence.
Pending
Record UAT test
Enter measured network metrics. AI will summarise the result.
Target ≥ 100 Mbps
Target ≥ 20 Mbps
Target ≤ 60 ms
Target ≥ 99.5 %
Target ≤ 1 %

Technician's subjective rating from the Starlink app.

Logged in the Signal quality audit trail.

5 / 6 targets met· Signal not rated
Latest test result
2026-06-01 07:08 UTC
[FAIL]
MetricTargetMeasuredResult
Download≥ 100 Mbps100 Mbps[PASS]
Upload≥ 20 Mbps20 Mbps[PASS]
Latency≤ 60 ms60 ms[PASS]
Uptime≥ 99.5%99.5%[PASS]
Packet loss≤ 1%0%[PASS]
Signal quality≥ Good[FAIL]
AI review

Verdict · The site failed acceptance solely due to the absence of signal quality telemetry despite meeting all performance metrics.

Likely cause · configuration

Recommendation · Update terminal software and verify signal reporting in the dashboard.

Sign-off
Internal QA → client acceptance → DICT representative final sign-off.

Typing your name acts as an electronic signature on this UAT acceptance.

Audit trail
  • approvedclientMs. Reyes — DICTAcceptance confirmed. Site is live.2026-05-28 11:42 UTC
  • approvedinternalNOC Supervisor — A. MercadoAll SLA metrics met. Cleared for client review.2026-05-26 11:42 UTC
Signed UAT form
DICT downloads the generated UAT PDF, signs it offline, and uploads the countersigned copy here. Once uploaded, the installation is officially accepted.
Available once DICT has approved & signed digitally.
Test history
WhenDLULLatUp%Loss%SignalResult
2026-05-23 11:42 UTC142.524.84299.920.2Excellent[PASS]
Signal quality audit log
Every change to the Signal quality rating, with who recorded it.
WhenFromToChanged byRole
2026-06-01 07:08 UTCExcellenttechniciantechnician